Dam re vamp
We recently re vamped a dam close to Byo, de silting and deepening it. In total 14,000 cubes were removed. We also widened the dam wall, removed trees from it and built a road across it.
We recently re vamped a dam close to Byo, de silting and deepening it. In total 14,000 cubes were removed. We also widened the dam wall, removed trees from it and built a road across it.
We recently transported a grader and roller to Nyika growth point about 60km outside Masvingo....
Check out the D8 bulldozer we transported this week.....
The pictures show the reach of our loader to allow easy loading of tipper trucks.
Removal of old fuel tanks from a garage in West Nic using our Komatsu PC 200 excavator...
The pictures below show how low down our low bed can go to accommodate loading of vehicles with little ground clearance.
The use of our low bed was recently required to move some rather large stainless steel tanks. The job took a total of two days during which there were no hiccups!!
Currently we have two of our machines moving large boulders..... and surface leveling in Kalvin, Bulawayo.
We have concluded our 7km road cutting in the bush close to Esigodini. These roads are 5m wide....very pleased with the result!